Slurry retaining wall drilling sediment treatment device for building pile foundation
The slurry retaining wall drilling sediment treatment device for the building pile foundation comprises a retaining wall, a supporting frame is fixedly installed on the upper surface of the retainingwall, an installation plate is fixedly connected to the upper end of the supporting frame, a hydrauli...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The slurry retaining wall drilling sediment treatment device for the building pile foundation comprises a retaining wall, a supporting frame is fixedly installed on the upper surface of the retainingwall, an installation plate is fixedly connected to the upper end of the supporting frame, a hydraulic push rod is fixedly installed on the lower surface of the installation plate, and a movable pushrod is arranged at the lower end of the hydraulic push rod. An extension rod is fixedly installed at the lower end of the movable push rod, a sludge suction box is fixedly connected to the lower end of the extension rod, sludge scraping brushes are fixedly connected to the outer surface of the periphery of the sludge suction box, a sludge suction opening is formed in the lower surface of the sludge suction box, and a sludge suction pump is fixedly installed on the outer wall of one side of the supporting frame; a mud pumping hose is fixedly mounted at one end of the mud suction pump, and the lower end of the mud pumpin |
---|