Slurry retaining wall drilling sediment treatment device for building pile foundation

The slurry retaining wall drilling sediment treatment device for the building pile foundation comprises a retaining wall, a supporting frame is fixedly installed on the upper surface of the retainingwall, an installation plate is fixedly connected to the upper end of the supporting frame, a hydrauli...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: JIANG SHIDAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator JIANG SHIDAN
description The slurry retaining wall drilling sediment treatment device for the building pile foundation comprises a retaining wall, a supporting frame is fixedly installed on the upper surface of the retainingwall, an installation plate is fixedly connected to the upper end of the supporting frame, a hydraulic push rod is fixedly installed on the lower surface of the installation plate, and a movable pushrod is arranged at the lower end of the hydraulic push rod. An extension rod is fixedly installed at the lower end of the movable push rod, a sludge suction box is fixedly connected to the lower end of the extension rod, sludge scraping brushes are fixedly connected to the outer surface of the periphery of the sludge suction box, a sludge suction opening is formed in the lower surface of the sludge suction box, and a sludge suction pump is fixedly installed on the outer wall of one side of the supporting frame; a mud pumping hose is fixedly mounted at one end of the mud suction pump, and the lower end of the mud pumpin
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN212079238UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN212079238UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN212079238UU3</originalsourceid><addsrcrecordid>eNqNijEKAjEQRdNYiHqHwV7Q3UKtF8XKRlMvcTMrA-MkTBLF20vEA1i9_z5vauyFi-obFLMjIbnDyzGDV2KultDTAyVDVnT5uzw-aUAYg8KtEPuaReL6FPEuU5C5mYyOEy5-nJnl8XDtTiuMoccU3YCCue_OzaZZb_dNu7O2_Sv6ALhWOr4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Slurry retaining wall drilling sediment treatment device for building pile foundation</title><source>esp@cenet</source><creator>JIANG SHIDAN</creator><creatorcontrib>JIANG SHIDAN</creatorcontrib><description>The slurry retaining wall drilling sediment treatment device for the building pile foundation comprises a retaining wall, a supporting frame is fixedly installed on the upper surface of the retainingwall, an installation plate is fixedly connected to the upper end of the supporting frame, a hydraulic push rod is fixedly installed on the lower surface of the installation plate, and a movable pushrod is arranged at the lower end of the hydraulic push rod. An extension rod is fixedly installed at the lower end of the movable push rod, a sludge suction box is fixedly connected to the lower end of the extension rod, sludge scraping brushes are fixedly connected to the outer surface of the periphery of the sludge suction box, a sludge suction opening is formed in the lower surface of the sludge suction box, and a sludge suction pump is fixedly installed on the outer wall of one side of the supporting frame; a mud pumping hose is fixedly mounted at one end of the mud suction pump, and the lower end of the mud pumpin</description><language>chi ; eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201204&amp;DB=EPODOC&amp;CC=CN&amp;NR=212079238U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201204&amp;DB=EPODOC&amp;CC=CN&amp;NR=212079238U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>JIANG SHIDAN</creatorcontrib><title>Slurry retaining wall drilling sediment treatment device for building pile foundation</title><description>The slurry retaining wall drilling sediment treatment device for the building pile foundation comprises a retaining wall, a supporting frame is fixedly installed on the upper surface of the retainingwall, an installation plate is fixedly connected to the upper end of the supporting frame, a hydraulic push rod is fixedly installed on the lower surface of the installation plate, and a movable pushrod is arranged at the lower end of the hydraulic push rod. An extension rod is fixedly installed at the lower end of the movable push rod, a sludge suction box is fixedly connected to the lower end of the extension rod, sludge scraping brushes are fixedly connected to the outer surface of the periphery of the sludge suction box, a sludge suction opening is formed in the lower surface of the sludge suction box, and a sludge suction pump is fixedly installed on the outer wall of one side of the supporting frame; a mud pumping hose is fixedly mounted at one end of the mud suction pump, and the lower end of the mud pumpin</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijEKAjEQRdNYiHqHwV7Q3UKtF8XKRlMvcTMrA-MkTBLF20vEA1i9_z5vauyFi-obFLMjIbnDyzGDV2KultDTAyVDVnT5uzw-aUAYg8KtEPuaReL6FPEuU5C5mYyOEy5-nJnl8XDtTiuMoccU3YCCue_OzaZZb_dNu7O2_Sv6ALhWOr4</recordid><startdate>20201204</startdate><enddate>20201204</enddate><creator>JIANG SHIDAN</creator><scope>EVB</scope></search><sort><creationdate>20201204</creationdate><title>Slurry retaining wall drilling sediment treatment device for building pile foundation</title><author>JIANG SHIDAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN212079238UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>JIANG SHIDAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>JIANG SHIDAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Slurry retaining wall drilling sediment treatment device for building pile foundation</title><date>2020-12-04</date><risdate>2020</risdate><abstract>The slurry retaining wall drilling sediment treatment device for the building pile foundation comprises a retaining wall, a supporting frame is fixedly installed on the upper surface of the retainingwall, an installation plate is fixedly connected to the upper end of the supporting frame, a hydraulic push rod is fixedly installed on the lower surface of the installation plate, and a movable pushrod is arranged at the lower end of the hydraulic push rod. An extension rod is fixedly installed at the lower end of the movable push rod, a sludge suction box is fixedly connected to the lower end of the extension rod, sludge scraping brushes are fixedly connected to the outer surface of the periphery of the sludge suction box, a sludge suction opening is formed in the lower surface of the sludge suction box, and a sludge suction pump is fixedly installed on the outer wall of one side of the supporting frame; a mud pumping hose is fixedly mounted at one end of the mud suction pump, and the lower end of the mud pumpin</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN212079238UU
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
title Slurry retaining wall drilling sediment treatment device for building pile foundation
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T07%3A20%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=JIANG%20SHIDAN&rft.date=2020-12-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN212079238UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true