Application of Gliding Scaffold System In Cable-Stayed Bridge Construction
Gonghe bridge is a double level cable-stayed concrete bridge with a single-cable-plane of single cable tower. Its span is 114+120 m and a whole length of 236 m. The gliding scaffold equipment is used for the first time in the long span cable-stayed bridge construction to reduce the construction time...
Gespeichert in:
Veröffentlicht in: | Journal of China University of Mining and Technology 2005-06, Vol.15 (2), p.152-156 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Gonghe bridge is a double level cable-stayed concrete bridge with a single-cable-plane of single cable tower. Its span is 114+120 m and a whole length of 236 m. The gliding scaffold equipment is used for the first time in the long span cable-stayed bridge construction to reduce the construction time limit. In the process of construction, to make sure a safe connection among concrete objects with different ages, the single-supporting and single-suspension system is adopted before the concrete pouring. While the double-supporting and single-suspension system is applied after concrete pouring. These construction systems with gliding scaffold equipment are first introduced in long span cable-stayed bridge and presented in detail' The practice shows that these gliding scaffold systems have many advantages over the traditional ones. |
---|---|
ISSN: | 1006-1266 |