Application of Gliding Scaffold System In Cable-Stayed Bridge Construction

Gonghe bridge is a double level cable-stayed concrete bridge with a single-cable-plane of single cable tower. Its span is 114+120 m and a whole length of 236 m. The gliding scaffold equipment is used for the first time in the long span cable-stayed bridge construction to reduce the construction time...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of China University of Mining and Technology 2005-06, Vol.15 (2), p.152-156
Hauptverfasser: Yu, Bao-Chu, Zhang, Zhe, Chang, Fu-Ping
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Gonghe bridge is a double level cable-stayed concrete bridge with a single-cable-plane of single cable tower. Its span is 114+120 m and a whole length of 236 m. The gliding scaffold equipment is used for the first time in the long span cable-stayed bridge construction to reduce the construction time limit. In the process of construction, to make sure a safe connection among concrete objects with different ages, the single-supporting and single-suspension system is adopted before the concrete pouring. While the double-supporting and single-suspension system is applied after concrete pouring. These construction systems with gliding scaffold equipment are first introduced in long span cable-stayed bridge and presented in detail' The practice shows that these gliding scaffold systems have many advantages over the traditional ones.
ISSN:1006-1266