Particle Swarm-Based Translation Control for Immersed Tunnel Element in the Hong Kong–Zhuhai–Macao Bridge Project

Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge (HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide the magnitude and direction of the towing force for eachtug, a particle swarm-based...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:China ocean engineering 2018-03, Vol.32 (1), p.32-40
Hauptverfasser: Li, Jun-jun, Yang, Xiao-jun, Xiao, Ying-jie, Xu, Bo-wei, Wu, Hua-feng
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge (HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide the magnitude and direction of the towing force for eachtug, a particle swarm-based translation control method is presented for non-power immersed tunnel element. A sort of linear weighted logarithmic function is exploited to avoid weak subgoals. In simulation, the particle swarm-based control method is evaluated and compared with traditional empirical method in the case of the HZMB project. Simulation results show that the presented method delivers performance improvement in terms of the enhanced surplus towing force.
ISSN:0890-5487
2191-8945
DOI:10.1007/s13344-018-0004-2