Simulation analysis of construction process of high rock slope's stabilization

U416.3; A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope' s stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analys...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:哈尔滨工业大学学报(英文版) 2008-04, Vol.15 (2), p.188-193
Hauptverfasser: ZHU Zhan-yuan, LING Xian-zhang, WANG Xuan-qing, ZOU Zu-yin
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:U416.3; A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope' s stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and dis-placement vector graphs at different construction steps were obtained, and the behavior of the slope during stabi-lization construction process was analyzed quantitatively. Based on the analysis of safety factors of three different schemes of stabilization and two different construction schemes, the assessment of stability and bracing design of the construction process were performed. The results show that the original reinforcement design is improper;the stability of the rock slope is controlled by a developed structural plane, the stability factor after excavation is less than 1, and the free surface should be braced in time ; for stability, the construction sequence should adopt that bracing follows excavation step by step up to down; the local slide occurred during the construction process agrees with the dangerous slide determined by the numerical analysis, which proves the validity and rationality of the adopted method.