Preliminary Design of Control Network for HT-7U Tokamak Cryogenic System
O4; In the course of the cryoplant modernization, a control network will be set up in order to facilitate the control, the supervision, the centralized data acquisition and the alarm handling of the cryogenic system for HT-7U tokamak. The paper introduces the preliminary design of control network ba...
Gespeichert in:
Veröffentlicht in: | Plasma science & technology 2003-12, Vol.5 (6), p.2035-2038 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | O4; In the course of the cryoplant modernization, a control network will be set up in order to facilitate the control, the supervision, the centralized data acquisition and the alarm handling of the cryogenic system for HT-7U tokamak. The paper introduces the preliminary design of control network based on the Controller Link Network for HT-7U tokamak cryogenic system. The multi-layer structure mentioned in the paper is the mainstream of automatic control.The control philosophy, the structure of the network and the components for control are also presented. |
---|---|
ISSN: | 1009-0630 |
DOI: | 10.1088/1009-0630/5/6/004 |