Method for scheduling a project to design and manufacture a multi-component assembly
1. Technical Field A method for scheduling to design and manufacture a multi-component assembly includes identifying a project completion date, determining a tooling lead time for each of the plurality of components, determining a design completion date for each of the plurality of subassemblies, th...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | 1. Technical Field
A method for scheduling to design and manufacture a multi-component assembly includes identifying a project completion date, determining a tooling lead time for each of the plurality of components, determining a design completion date for each of the plurality of subassemblies, the design completion date being a function of the project completion date and the tooling lead times for each of the plurality of components, determining a design lead time for each of the plurality of components, and determining a design start date for each of the plurality of components. |
---|