Control system for construction machines
Abnormality can be judged accurately by considering information other than a sensor-detected value. Determination of an abnormality degree, namely an urgency degree, is enabled, and an abnormality can be processed accurately according to the determined result. Only information really useful is given...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Abnormality can be judged accurately by considering information other than a sensor-detected value. Determination of an abnormality degree, namely an urgency degree, is enabled, and an abnormality can be processed accurately according to the determined result. Only information really useful is given to the side of an administrator, and the communications cost is suppressed. Server unit
11
of manufacturer
10
judges the abnormality degree of a construction machine on the basis of a combination of all or two of first to third construction machine information D1, D2, D3 collected. The server unit
11
of the manufacturer
10
ranks the abnormality degree of the construction machine in respective levels of Rank 1 (Normal), Rank 2 (Warning), Rank 3 (Abnormal) and Rank 4 (Emergency) on the basis of the number of occurred times of error codes collected for the unit time. |
---|