Construction loads using a shoring-clearing-striking process
[EN] This paper presents the results of tests carried out during the construction of a block of flats with reinforced concrete slab floors in Madrid, Spain, using the shoring, clearing and striking (SCS) process. Loads on shores were recorded during the different construction stages of Floor Slabs 1...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | [EN] This paper presents the results of tests carried out during the construction of a block of flats with reinforced concrete slab floors in Madrid, Spain, using the shoring, clearing and striking (SCS) process. Loads on shores were recorded during the different construction stages of Floor Slabs 1 to 6.
The experimental results were used to analyse load transmission between slabs and shores during the construction of the building. The results of the analysis showed that slab-shore load transmission differed according to the position of the span analysed and also that variations in the construction process had a significant effect on the expected loads. The paper includes the evolving calculation developed by a non-linear numerical model to simulate the building s behaviour during the different construction phases and variations in the concrete properties with time.
The experimental and numerical FEM results were compared with those obtained applying simplified methods that consider the real stiffness of the shoring.
Gasch, I.; Alvarado Vargas, YA.; Calderón García, PA.; Ivorra Chorro, S. (2014). Construction loads using a shoring-clearing-striking process. Proceedings of the ICE - Structures and Buildings. 167(4):217-229. doi:10.1680/stbu.12.00006 |
---|