Estudio de soluciones para el encauzamiento y reposición de la desembocadura del barranco del Algarrobo entre la carretera ALP-118 y el mar en Vera (Almería). Estudio hidrológico
[EN] The main aim of this project is to define the best solution to the recent floods that they have had in the área. This will involve channeling the mouth of the river, which is formed by the Algarrobo canyon, and which ends in the Mediterraen sea. The floods were caused by the occupation of the l...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Dissertation |
Sprache: | spa |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | [EN] The main aim of this project is to define the best solution to the recent floods that they have had in the área. This will involve channeling the mouth of the river, which is formed by the Algarrobo canyon, and which ends in the Mediterraen sea. The floods were caused by the occupation of the land, which previously was the mouth of the canyon. In addition, there was a road build, the ALP-118, in a parallel direction to the coastline, this has disrupted, water¿s natural groundwater flows, causing a wetland to form. Its volumen has increased rapidly aided by the impermeability of the ground in the área, mainly made up of clay. The solution is thought as a construction to evacuate the peak wáter volumen for the 200 year return period storm, whilst the smaller ones, with lower return periods will rehydrate the wetland. To reduce the peak discharge and prevent floods in the área a labyrinth spillway will be used at the start of the channel. This project aims to get the most feasible solution, from an economic, functional and environmental point of view. To manage this a small dam will be built, surounding the wetland, enabling its height to be raised. The project is composed of five main parts: hydrologic study, geotechnical study, the design of the dam and the labyrinth spillway,, hydraulic and structural calculation of the channel and and overall economic evaluation.
[CA] El projecte consistix en l'estudi de solucions per al disseny d'una canalització que repose la desembocadura al mar del barranc de la Garrofera en Vera (Almeria) , la qual es va veure afectada per la construcció d'una urbanització que ha ocupat tot el terreny que antigament servia com a desembocadura del dit barranc. Esta ocupació ha provocat en estos últims anys inundacions en les edificacions de la zona. A més, la construcció de la carretera ALP-118, paral·lela a la línia de costa, ha generat un aiguamoll amb làmina d'aigua permanent a causa de la impermeabilitat del terreny i a l'altura del nivell freàtic en la zona, el qual es vol rehidratar amb les aigües de tempestats de períodes de retorns baixos, dissenyant així la canalització per a la tempestat de període de retorn de 200 anys, amb embocadura en el dit aiguamoll amb un sobreeixidor tipus pic d'ànec que lamine el cabal pic de l'hidrograma d'arribada a l'aiguamoll a un cabal de disseny que permeta unes dimensions econòmiques per a la canalització. Per a este objectiu últim es planteja la construcció d'un dic paral·lel a la carre |
---|