Maintenance Plan for a Fleet of Rotary Drill Rigs

In this paper a basic methodology was used for the reliability modeling and developing a maintenance program for a fleet of four drilling rigs. Failure and performance data was collected from Sarcheshmeh Copper Mine in Iran for a two-year period. Then the available data was classified and analyzed a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Archives of mining sciences = Archiwum górnictwa 2014-06, Vol.59 (2), p.441
Hauptverfasser: Rahimdel, Mohammad Javad, Ataei, Mohammad, Khalokakaei, Reza, Hoseinie, Hadi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper a basic methodology was used for the reliability modeling and developing a maintenance program for a fleet of four drilling rigs. Failure and performance data was collected from Sarcheshmeh Copper Mine in Iran for a two-year period. Then the available data was classified and analyzed and reliability of all subsystems and whole rigs were modeled and studied. The failure data showed that, in all rigs, electrical, hydraulic and drilling systems are the most frequent failing subsystems of the machine. The reliability analysis showed that transmission system is the most reliable subsystem in all studied rigs. In order to calculate the reliability of whole fleet, it was assumed that operation of at least two drilling rigs is essential for satisfying the production goals. Therefore, probabilistic possibility of all fleet's states were calculated. In this paper, 80% is selected as the desired level of reliability for developing of preventive maintenance program for each subsystem of the drilling rigs. Finally, the practical approaches were suggested for improving the maintenance operation and productivity of the studied fleet.
ISSN:1689-0469
0860-7001
1689-0469
DOI:10.2478/amsc-2014-0031