Integrating remediation and resource recovery: On the economic conditions of landfill mining

•We compare two remediation scenarios; one with resource recovery and one without.•Economic analysis includes relevant direct costs and revenues for the landfill owner.•High degrees of metal and/or combustible contents are important economic factors.•Landfill tax and the access to a CHP can have a l...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Waste management (Elmsford) 2015-08, Vol.42, p.137-147
Hauptverfasser: Frändegård, Per, Krook, Joakim, Svensson, Niclas
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:•We compare two remediation scenarios; one with resource recovery and one without.•Economic analysis includes relevant direct costs and revenues for the landfill owner.•High degrees of metal and/or combustible contents are important economic factors.•Landfill tax and the access to a CHP can have a large impact on the result.•Combining landfill mining and remediation may decrease the project cost. This article analyzes the economic potential of integrating material separation and resource recovery into a landfill remediation project, and discusses the result and the largest impact factors. The analysis is done using a direct costs/revenues approach and the stochastic uncertainties are handled using Monte Carlo simulation. Two remediation scenarios are applied to a hypothetical landfill. One scenario includes only remediation, while the second scenario adds resource recovery to the remediation project. Moreover, the second scenario is divided into two cases, case A and B. In case A, the landfill tax needs to be paid for re-deposited material and the landfill holder does not own a combined heat and power plant (CHP), which leads to disposal costs in the form of gate fees. In case B, the landfill tax is waived on the re-deposited material and the landfill holder owns its own CHP. Results show that the remediation project in the first scenario costs about €23/ton. Adding resource recovery as in case A worsens the result to −€36/ton, while for case B the result improves to −€14/ton. This shows the importance of landfill tax and the access to a CHP. Other important factors for the result are the material composition in the landfill, the efficiency of the separation technology used, and the price of the saleable material.
ISSN:0956-053X
1879-2456
1879-2456
DOI:10.1016/j.wasman.2015.04.008