Flexible manufacturing system with industry 4.0
Concert of machines and AGVs are assessed by using priority rules like RISA rule to find out the operational completion time for considering 40 problems with travel time by process time is less than 0.25 by assuming travel time half and process time triple. The experiments are conducted by consideri...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Concert of machines and AGVs are assessed by using priority rules like RISA rule to find out the operational completion time for considering 40 problems with travel time by process time is less than 0.25 by assuming travel time half and process time triple. The experiments are conducted by considering various factors of AGVs and machines scheduling in flexible manufacturing system (FMS). AGVs and Machine scheduling rules, computer model is designed like JAVA programming. |
---|---|
ISSN: | 0094-243X 1551-7616 |
DOI: | 10.1063/5.0143069 |