Flexible manufacturing system with industry 4.0

Concert of machines and AGVs are assessed by using priority rules like RISA rule to find out the operational completion time for considering 40 problems with travel time by process time is less than 0.25 by assuming travel time half and process time triple. The experiments are conducted by consideri...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Padhi, S. Narayana, Rao, M. Nageswara, Reddy, M. Bala Satya Sreekara, Rakesh, K., Savitri, V., Kumar, D. Sandeep
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Concert of machines and AGVs are assessed by using priority rules like RISA rule to find out the operational completion time for considering 40 problems with travel time by process time is less than 0.25 by assuming travel time half and process time triple. The experiments are conducted by considering various factors of AGVs and machines scheduling in flexible manufacturing system (FMS). AGVs and Machine scheduling rules, computer model is designed like JAVA programming.
ISSN:0094-243X
1551-7616
DOI:10.1063/5.0143069