Risk assessment of waste gas pipeline for production well facility
PIMS (Pipeline Integrity Management System) is a management system used in the area of a system pipe network based on a risk is in the pipe in order to make the pipe fixed can send fluid with a reliable and safe. How to work PIMS to conduct modeling approach and simulation through a process assessme...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!