Risk assessment of waste gas pipeline for production well facility

PIMS (Pipeline Integrity Management System) is a management system used in the area of a system pipe network based on a risk is in the pipe in order to make the pipe fixed can send fluid with a reliable and safe. How to work PIMS to conduct modeling approach and simulation through a process assessme...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Astari, Marsha, Setiadi
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PIMS (Pipeline Integrity Management System) is a management system used in the area of a system pipe network based on a risk is in the pipe in order to make the pipe fixed can send fluid with a reliable and safe. How to work PIMS to conduct modeling approach and simulation through a process assessment both in terms of design, construction, maintenance, and operation. All the information be integrated to identify program integrity that can be done. In this paper, the program integrity are only referring to cover on part integrity the process management. The purpose of research is to give a strategy or instrument for regulating effectively and efficiently in the operation, inspection, maintenance management based on the levels of risk.
ISSN:0094-243X
1551-7616
DOI:10.1063/5.0014775