Research on millisecond load recovery strategy in the late period of UHVDC fault dispose
When UHVDC has a fault, it needs to quickly cut off the load so that the entire system can keep balance. In the late period of fault dispose, it needs to recover the load step by step. The recovery strategy of millisecond load is studied in this paper. Aimed at the maximum recovery load in one step,...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | When UHVDC has a fault, it needs to quickly cut off the load so that the entire system can keep balance. In the late period of fault dispose, it needs to recover the load step by step. The recovery strategy of millisecond load is studied in this paper. Aimed at the maximum recovery load in one step, combined with grid security constraints, the recovery model of millisecond load is built, and then solved by Genetic Algorithms. The simulation example is established to verify the effectiveness of proposed method. |
---|---|
ISSN: | 0094-243X 1551-7616 |
DOI: | 10.1063/1.5041184 |