Experience upgrading 18F target and control system of an unshielded RDS112

The 18F target and the Control System of an unshielded CTI RDS112 cyclotron have been upgraded in order to increase 18F-fluoride production and meet new radioprotection requirements of the National Regulator, among other goals. At present, maximum capacity of 18F-fluoride production of the cyclotron...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Arenas, G., Calderon, G., Noya, E.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The 18F target and the Control System of an unshielded CTI RDS112 cyclotron have been upgraded in order to increase 18F-fluoride production and meet new radioprotection requirements of the National Regulator, among other goals. At present, maximum capacity of 18F-fluoride production of the cyclotron is about 5 times bigger than originally with a higher reproducibility and more flexibility given by two targets with different rated filling capacities. Also, safety and procedure interlock systems have been integrated and validated in the new Control System.
ISSN:0094-243X
1551-7616
DOI:10.1063/1.4983533