Status of the booster synchrotron for SPring‐8

The specification and the layout of the booster synchrotron for SPring‐8 were decided. The synchrotron is designed to accelerate electron or positron beams from 1 to 8 GeV with a repetition cycle of 1 Hz. The construction of the synchrotron was started in 1993. First, one bending, one quadrupole, an...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Review of Scientific Instruments 1995-02, Vol.66 (2), p.1964-1967
Hauptverfasser: Suzuki, H., Yonehara, H., Aoki, T., Tani, N., Kaneda, T., Ueyama, Y., Sasaki, Y., Nagafuchi, T., Hayashi, S., Yokomizo, H.
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The specification and the layout of the booster synchrotron for SPring‐8 were decided. The synchrotron is designed to accelerate electron or positron beams from 1 to 8 GeV with a repetition cycle of 1 Hz. The construction of the synchrotron was started in 1993. First, one bending, one quadrupole, and one sextupole magnet were made and the results of the magnetic field measurement were acquired. Two septum, one bump, and one kicker magnets for the beam extraction have been made, the field measurement and a few improvements have progressed. The high power test of the first rf cavity was finished successfully. The calibration test of the button position monitor with the signal treatment circuits is advanced now. The residual components of the synchrotron are designed and constructed, and the commissioning of the synchrotron will start in 1996. This paper presents the first measurement of each component.
ISSN:0034-6748
1089-7623
DOI:10.1063/1.1145771