The relationship between geophysical and geotechnical data: a temporal analysis of an iron ore tailings dam

Iron ore tailings dams must be constantly monitored for safety purposes. Among the aspects traditionally monitored are geotechnical protocols, such as piezometric levels along the dam. Recently, geophysics, a science that studies, among other things, dynamic processes in the Earth, has contributed t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Soils & rocks 2024-10, Vol.47 (4), p.e2024011923
Hauptverfasser: Freitas, Isabela, Santos, Hersilia
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Iron ore tailings dams must be constantly monitored for safety purposes. Among the aspects traditionally monitored are geotechnical protocols, such as piezometric levels along the dam. Recently, geophysics, a science that studies, among other things, dynamic processes in the Earth, has contributed to non-invasive monitoring using electro-resistivity methods. Geophysical methods provide a large amount of data in relatively quick samples, but there is little information on the integration of traditional geotechnical and geophysical techniques. Therefore, this work aimed to evaluate the relationship between geophysical data, monitored every 15 days between May 2022 and March 2023, and geotechnical data from an iron ore tailings dam located in the Iron Quadrangle. The geophysical method used was two-dimensional electrical imaging with a Schlumberger array. Analysis of variance and multiple regression allowed us to evaluate the relationship between resistivity values, piezometer level, sampling time, and rainfall. Piezometry data explained the electroresistivity significantly, while sampling time and rainfall did not significantly explain electro-resistivity. Therefore, the dam’s electro-resistivity patterns have not changed significantly over the period, and local rainfall does not imply an immediate response in resistivity. These conclusions can support new directions in decisions about monitoring iron ore tailings dams and may contribute to advances in dam safety in the mining sector.
ISSN:1980-9743
2675-5475
2675-5475
DOI:10.28927/SR.2024.011923