A SOCIAL COST BENEFIT ANALYSIS OF EXTENDING AN EXISTING RECYCLING PLANT TO ACCOMMODATE THE RECYCLING OF THE PLASTIC FRACTION OF CABLE SCRAP

This paper investigates the economic efficiency of extending an existing cable waste recycling plant to accommodate the recycling of the plastic fraction of cable waste. The paper shows that when a cost benefit analysis (CBA) is carried out, the decision-making criteria generate conflicting results....

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:South African journal of industrial engineering 2009-11, Vol.20 (2), p.179-192
Hauptverfasser: Du Preez, M, Lottering, T
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper investigates the economic efficiency of extending an existing cable waste recycling plant to accommodate the recycling of the plastic fraction of cable waste. The paper shows that when a cost benefit analysis (CBA) is carried out, the decision-making criteria generate conflicting results. More specifically, the net present value (NPV) is greater than zero, the internal rate of return (IRR) is less than the social discount rate, and the benefit cost ratio (BCR) is less than unity. Based on these results, one is unable to provide unqualified support for the project. [PUBLICATION ABSTRACT]
ISSN:1012-277X
2224-7890
2224-7890
DOI:10.7166/20-2-768