Legacy corner - the new face of Sandton's CBD : on the cover
Timely project execution has, however, been no mean feat with engineers receiving significant scope changes, including the addition of four floors to the building, at an advanced stage of the structural design phase. Productivity enhancing building information modelling (BIM) technology accelerated...
Gespeichert in:
Veröffentlicht in: | Civil engineering (Johannesburg, South Africa) South Africa), 2009-01, Vol.17 (1), p.9-12 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Timely project execution has, however, been no mean feat with engineers receiving significant scope changes, including the addition of four floors to the building, at an advanced stage of the structural design phase. Productivity enhancing building information modelling (BIM) technology accelerated and coordinated drawing production, enabling engineers to stay on top of the project, keeping it on track for its pre-2010 opening. |
---|---|
ISSN: | 1021-2000 |