Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation
Nowadays, with the leap-forward development of computer technology and the transformation of information technology management concepts, China’s construction industry is quietly entering the era of refined management. Accurate estimation and cost control have become among the key considerations of t...
Gespeichert in:
Veröffentlicht in: | Computational intelligence and neuroscience 2021, Vol.2021 (1), p.3292376-3292376, Article 3292376 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Nowadays, with the leap-forward development of computer technology and the transformation of information technology management concepts, China’s construction industry is quietly entering the era of refined management. Accurate estimation and cost control have become among the key considerations of the construction industry. For the calculation of engineering quantity, there are already many software devices that can be used for the calculation of engineering structure quantity, which means that the incorrect operation of personnel has been reduced to some extent, improving the work efficiency and measurement accuracy. The purpose of this paper is to solve the problems of computational missing, computational errors, inefficiency, data loss, and repetitive system in traditional computing based on the advantages of BIM computing system, which provide a reliable basis for cost forecasting and control. At the same time, using BMI calculation system to solve the problem of steel reinforcement in construction engineering, as well as the use of personnel, the existing calculation software still needs a lot of time and energy. We proposed a comprehensive evaluation study of reinforcement calculation in domestic construction engineering BIM calculation system based on a fuzzy comprehensive evaluation. This paper first summarizes the BIM calculation system of construction engineering, uses fuzzy comprehensive evaluation system as an important evaluation index system in domestic construction engineering BIM calculation system, through the judgment of various factors affecting the actual effect of the calculation system, and uses the fuzzy evaluation system combined with a case to demonstrate the superiority of the proposed research. Therefore, through the above research and experiments, it is concluded that the research method of this paper solves many problems in the process of engineering structure reinforcement calculation and provides a good reference method for the establishment of comprehensive evaluation system of reinforcement calculation, as well as providing an effective validation for the widespread use of BIM technology in the construction industry. Finally, it is also beneficial for users to comprehensively evaluate the BIM calculation system of the construction industry and provide a basic reference condition for different industries to use and choose BIM calculation systems. |
---|---|
ISSN: | 1687-5265 1687-5273 |
DOI: | 10.1155/2021/3292376 |