Challenges faced in establishing a dedicated 250 bed COVID-19 intensive care unit in a temporary structure

An Intensive Care Unit (ICU) is an organized system for the provision of care to critically ill patients that provides intensive and specialized medical and nursing care, an enhanced capacity for monitoring, and multiple modalities of physiologic organ support to sustain life during a period of life...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Trends in anaesthesia & critical care 2021-02, Vol.36, p.9-16
Hauptverfasser: Singh, Shalendra, Ambooken, George Cherian, Setlur, Rangraj, Paul, Shamik Kr, Kanitkar, Madhuri, Singh Bhatia, Surinder, Singh Kanwar, Ratnesh
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:An Intensive Care Unit (ICU) is an organized system for the provision of care to critically ill patients that provides intensive and specialized medical and nursing care, an enhanced capacity for monitoring, and multiple modalities of physiologic organ support to sustain life during a period of life-threatening organ system insufficiency. While this availability of trained manpower and specialized equipment makes it possible to care for critically ill patients, it also presents singular challenges in the form of man and material management, design concerns, budgetary concerns, and protocolization of treatment. Consequently, the establishment of an ICU requires rigorous design and planning, a process that can take months to years. However, the Coronavirus disease-19 (COVID-19) epidemic has required the significant capacity building to accommodate the increased number of critically ill patients. At the peak of the pandemic, many countries were forced to resort to the building of temporary structures to house critically ill patients, to help tide over the crisis. This narrative review describes the challenges and lessons learned while establishing a 250 bedded ICU in a temporary structure and achieving functionality within a period of a fortnight.
ISSN:2210-8440
2210-8467
DOI:10.1016/j.tacc.2020.10.006