Converting existing transmission corridors to HVDC is an overlooked option for increasing transmission capacity
A changing generation mix and growing demand for carbon-free electricity will almost certainly require dramatic changes in the infrastructure and topology of the electricity system. Rather than build new lines, one way to minimize social opposition and regulatory obstacles is to increase the capacit...
Gespeichert in:
Veröffentlicht in: | Proceedings of the National Academy of Sciences - PNAS 2019-07, Vol.116 (28), p.13879-13884 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A changing generation mix and growing demand for carbon-free electricity will almost certainly require dramatic changes in the infrastructure and topology of the electricity system. Rather than build new lines, one way to minimize social opposition and regulatory obstacles is to increase the capacity of existing transmission corridors. In addition to upgrading the capacity of highvoltage alternating current (HVAC) lines, we identify a number of situations in which conversion from HVAC to high-voltage direct current (HVDC) is the least-cost strategy to increase the capacity of the corridor. If restricted to the existing right-of-way (ROW), we find DC conversion to be the least-cost, and in some cases the only, option for distances of >200 km or for increases of >50% capacity. Across all configurations analyzed, we assess HVDC conversion to be the lower-cost option at >350 km and >50% capacity increases. While we recognize that capacity expansion through HVDC conversion may be the optimal solution in only some situations, with future improvements in the cost and performance of solid-state power electronics, conversion to HVDC could be attractive in a growing set of circumstances. |
---|---|
ISSN: | 0027-8424 1091-6490 |
DOI: | 10.1073/pnas.1905656116 |