CURRENT PERFORMANCE CRITERIA
* Pilot Credit 26: Advanced Energy Metering calls for the permanent installation of advanced energy metering systems to record data at one-hour intervals and transmit the data wirelessly to a remote location. The data must be shared with USGBC or USGBC's Building Performance Partnership.
Gespeichert in:
Veröffentlicht in: | Environmental Design + Construction 2011-08, Vol.14 (8), p.25-25 |
---|---|
1. Verfasser: | |
Format: | Magazinearticle |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | * Pilot Credit 26: Advanced Energy Metering calls for the permanent installation of advanced energy metering systems to record data at one-hour intervals and transmit the data wirelessly to a remote location. The data must be shared with USGBC or USGBC's Building Performance Partnership. |
---|---|
ISSN: | 1095-8932 2328-5567 |