Journal bearings put to the test

Three months of field trials were carried out on New Delhi - Guwahati express services in late 2009 to evaluate system functionality and ensure that electrical connections could survive the rigours of rail operations. The 3 758 km return trip takes 54 h, with a maximum speed of 140 km/h and a longes...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Railway Gazette International 2010-08, Vol.166 (8), p.56-56
Hauptverfasser: Naidu, Sreenivas, Klaehn, Thorsten, Buchanan, Alan
Format: Magazinearticle
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Three months of field trials were carried out on New Delhi - Guwahati express services in late 2009 to evaluate system functionality and ensure that electrical connections could survive the rigours of rail operations. The 3 758 km return trip takes 54 h, with a maximum speed of 140 km/h and a longest non-stop run of 440 km. The minimum ambient temperature recorded was 12-rC, the highest 33-40C and the maximum bearing temperature measured was 74 degree C (Fig 1).
ISSN:0373-5346