CRYSTAL BOXES

Early in the process, the MacKimmie Complex was selected as one of sixteen projects to participate in the Canada Green Building Council (CaGBC)'s Zero Carbon Building pilot program, allowing access to additional technical expertise and to the sharing of experiences with other teams in the pilot...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:The Canadian Architect 2023-02, Vol.68 (1), p.27-30
1. Verfasser: Livesey, Graham
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 30
container_issue 1
container_start_page 27
container_title The Canadian Architect
container_volume 68
creator Livesey, Graham
description Early in the process, the MacKimmie Complex was selected as one of sixteen projects to participate in the Canada Green Building Council (CaGBC)'s Zero Carbon Building pilot program, allowing access to additional technical expertise and to the sharing of experiences with other teams in the pilot program. Replacing an older steel-framed building that was structurally inadequate, the Student Commons contains a variety of classrooms, study spaces, the Registrar's off ice, and the Hunter Hub for Entrepreneurial Thinking. CLIENT UNIVERSITY OF CALGARY | ARCHITECT TEAM DOUGLAS CINNAMON (RAIC), ROBERT CLAIBORNE (RAIC), JOHN SOULELES (RAIC), STEVE VERES, TRACY LIU, MATT PARKS, JODI JAMES, MATTHEW PARKER, NEAL PHILIPSEN, MATT STEWART, LEANNE JUNNILLA, CALEB HILDENBRANDT, KRISTEN FORWARD, HAYDEN PATTULLO, MICHELLE BRECHT, JOEL PENNER, RYAN VAN MARLE, STEPHANIE FARGAS | STRUCTURAL ENTUITIVE | MECHANICAL DIALOG-TIM MCGINN, MIKE BAUER, AMISHA POPE , MIKE TORJAN, MICHAEL MOCHULSKI, ALEX TANSOWNY | ELECTRICAL SMP ENGINEERING | CIVIL | LANDSCAPE DIALOG-DOUG CARLYLE, NATHAN GRIMSON, STACIE HARKER | INTERIORS DIALOG-LOUISE AROCHE, MARIA ZHANG, CARA OAKLEY, LARISSA MOORE | CONTRACTOR STUART OLSON | CLIMATE ENGINEERING TRANSSOLAR KLIMAENGINEERING | ENERGY MODELLING, COMPLIANCE AND TECHNICAL MODELLING DIALOG | CIVIL URBAN SYSTEMS | COMMISSIONING WSP | CODE JENSEN HUGHES | ACOUSTICS PATCHING AND ASSOCIATES | ACCESSIBILITY LEVEL PLAYING FIELD | WIND GRADIENT WIND | ELEVATOR VINSPEC | AREA 35,300 M2 | BUDGET $257 M | COMPLETION TOWER-NOV 2019; BLOCK AND LINK-SEPT 2022 ENERGY USE INTENSITY (PROJECTED) 75 KWH/M2/YEAR | WATER USE INTENSITY (PROJECTED) 0.31 M3/M2/YEAR |
format Article
fullrecord <record><control><sourceid>proquest</sourceid><recordid>TN_cdi_proquest_reports_3112174482</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>3112174482</sourcerecordid><originalsourceid>FETCH-proquest_reports_31121744823</originalsourceid><addsrcrecordid>eNpjYuA0tDQy1jU2NjVmYeA0MDCw0DWyMDfiYOAqLs4Ccg0NjQ04GXidgyKDQxx9FJz8I1yDeRhY0xJzilN5oTQ3g5Kba4izh25BUX5haWpxSXxRakF-UUlxvLGhoZGhuYmJhZExUYoALkwlBA</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>3112174482</pqid></control><display><type>article</type><title>CRYSTAL BOXES</title><source>Alma/SFX Local Collection</source><creator>Livesey, Graham</creator><creatorcontrib>Livesey, Graham</creatorcontrib><description>Early in the process, the MacKimmie Complex was selected as one of sixteen projects to participate in the Canada Green Building Council (CaGBC)'s Zero Carbon Building pilot program, allowing access to additional technical expertise and to the sharing of experiences with other teams in the pilot program. Replacing an older steel-framed building that was structurally inadequate, the Student Commons contains a variety of classrooms, study spaces, the Registrar's off ice, and the Hunter Hub for Entrepreneurial Thinking. CLIENT UNIVERSITY OF CALGARY | ARCHITECT TEAM DOUGLAS CINNAMON (RAIC), ROBERT CLAIBORNE (RAIC), JOHN SOULELES (RAIC), STEVE VERES, TRACY LIU, MATT PARKS, JODI JAMES, MATTHEW PARKER, NEAL PHILIPSEN, MATT STEWART, LEANNE JUNNILLA, CALEB HILDENBRANDT, KRISTEN FORWARD, HAYDEN PATTULLO, MICHELLE BRECHT, JOEL PENNER, RYAN VAN MARLE, STEPHANIE FARGAS | STRUCTURAL ENTUITIVE | MECHANICAL DIALOG-TIM MCGINN, MIKE BAUER, AMISHA POPE , MIKE TORJAN, MICHAEL MOCHULSKI, ALEX TANSOWNY | ELECTRICAL SMP ENGINEERING | CIVIL | LANDSCAPE DIALOG-DOUG CARLYLE, NATHAN GRIMSON, STACIE HARKER | INTERIORS DIALOG-LOUISE AROCHE, MARIA ZHANG, CARA OAKLEY, LARISSA MOORE | CONTRACTOR STUART OLSON | CLIMATE ENGINEERING TRANSSOLAR KLIMAENGINEERING | ENERGY MODELLING, COMPLIANCE AND TECHNICAL MODELLING DIALOG | CIVIL URBAN SYSTEMS | COMMISSIONING WSP | CODE JENSEN HUGHES | ACOUSTICS PATCHING AND ASSOCIATES | ACCESSIBILITY LEVEL PLAYING FIELD | WIND GRADIENT WIND | ELEVATOR VINSPEC | AREA 35,300 M2 | BUDGET $257 M | COMPLETION TOWER-NOV 2019; BLOCK AND LINK-SEPT 2022 ENERGY USE INTENSITY (PROJECTED) 75 KWH/M2/YEAR | WATER USE INTENSITY (PROJECTED) 0.31 M3/M2/YEAR |</description><identifier>ISSN: 0008-2872</identifier><identifier>EISSN: 1923-3353</identifier><language>eng</language><publisher>Toronto: IQ Business Media</publisher><subject>Architecture ; Automation ; Carbon ; Climate models ; Concrete ; Construction ; Cost control ; Design ; Energy consumption ; Frame structures ; Green buildings ; Pilot projects ; Steel frames ; Ventilation ; Water use</subject><ispartof>The Canadian Architect, 2023-02, Vol.68 (1), p.27-30</ispartof><rights>Copyright IQ Business Media Feb 2023</rights><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>312,780,784,791</link.rule.ids></links><search><creatorcontrib>Livesey, Graham</creatorcontrib><title>CRYSTAL BOXES</title><title>The Canadian Architect</title><description>Early in the process, the MacKimmie Complex was selected as one of sixteen projects to participate in the Canada Green Building Council (CaGBC)'s Zero Carbon Building pilot program, allowing access to additional technical expertise and to the sharing of experiences with other teams in the pilot program. Replacing an older steel-framed building that was structurally inadequate, the Student Commons contains a variety of classrooms, study spaces, the Registrar's off ice, and the Hunter Hub for Entrepreneurial Thinking. CLIENT UNIVERSITY OF CALGARY | ARCHITECT TEAM DOUGLAS CINNAMON (RAIC), ROBERT CLAIBORNE (RAIC), JOHN SOULELES (RAIC), STEVE VERES, TRACY LIU, MATT PARKS, JODI JAMES, MATTHEW PARKER, NEAL PHILIPSEN, MATT STEWART, LEANNE JUNNILLA, CALEB HILDENBRANDT, KRISTEN FORWARD, HAYDEN PATTULLO, MICHELLE BRECHT, JOEL PENNER, RYAN VAN MARLE, STEPHANIE FARGAS | STRUCTURAL ENTUITIVE | MECHANICAL DIALOG-TIM MCGINN, MIKE BAUER, AMISHA POPE , MIKE TORJAN, MICHAEL MOCHULSKI, ALEX TANSOWNY | ELECTRICAL SMP ENGINEERING | CIVIL | LANDSCAPE DIALOG-DOUG CARLYLE, NATHAN GRIMSON, STACIE HARKER | INTERIORS DIALOG-LOUISE AROCHE, MARIA ZHANG, CARA OAKLEY, LARISSA MOORE | CONTRACTOR STUART OLSON | CLIMATE ENGINEERING TRANSSOLAR KLIMAENGINEERING | ENERGY MODELLING, COMPLIANCE AND TECHNICAL MODELLING DIALOG | CIVIL URBAN SYSTEMS | COMMISSIONING WSP | CODE JENSEN HUGHES | ACOUSTICS PATCHING AND ASSOCIATES | ACCESSIBILITY LEVEL PLAYING FIELD | WIND GRADIENT WIND | ELEVATOR VINSPEC | AREA 35,300 M2 | BUDGET $257 M | COMPLETION TOWER-NOV 2019; BLOCK AND LINK-SEPT 2022 ENERGY USE INTENSITY (PROJECTED) 75 KWH/M2/YEAR | WATER USE INTENSITY (PROJECTED) 0.31 M3/M2/YEAR |</description><subject>Architecture</subject><subject>Automation</subject><subject>Carbon</subject><subject>Climate models</subject><subject>Concrete</subject><subject>Construction</subject><subject>Cost control</subject><subject>Design</subject><subject>Energy consumption</subject><subject>Frame structures</subject><subject>Green buildings</subject><subject>Pilot projects</subject><subject>Steel frames</subject><subject>Ventilation</subject><subject>Water use</subject><issn>0008-2872</issn><issn>1923-3353</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2023</creationdate><recordtype>article</recordtype><sourceid>ABUWG</sourceid><sourceid>AFKRA</sourceid><sourceid>AVQMV</sourceid><sourceid>AZQEC</sourceid><sourceid>BENPR</sourceid><sourceid>CCPQU</sourceid><sourceid>DWQXO</sourceid><sourceid>K50</sourceid><sourceid>M1D</sourceid><recordid>eNpjYuA0tDQy1jU2NjVmYeA0MDCw0DWyMDfiYOAqLs4Ccg0NjQ04GXidgyKDQxx9FJz8I1yDeRhY0xJzilN5oTQ3g5Kba4izh25BUX5haWpxSXxRakF-UUlxvLGhoZGhuYmJhZExUYoALkwlBA</recordid><startdate>20230201</startdate><enddate>20230201</enddate><creator>Livesey, Graham</creator><general>IQ Business Media</general><scope>3V.</scope><scope>7WY</scope><scope>7XB</scope><scope>883</scope><scope>8FE</scope><scope>8FG</scope><scope>8FK</scope><scope>8FL</scope><scope>8FQ</scope><scope>8FV</scope><scope>ABJCF</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AVQMV</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BEZIV</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>FRNLG</scope><scope>HCIFZ</scope><scope>K50</scope><scope>K60</scope><scope>K6~</scope><scope>L.-</scope><scope>L6V</scope><scope>M0F</scope><scope>M1D</scope><scope>M7S</scope><scope>PQBIZ</scope><scope>PQBZA</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><scope>PTHSS</scope><scope>Q9U</scope><scope>S0X</scope></search><sort><creationdate>20230201</creationdate><title>CRYSTAL BOXES</title><author>Livesey, Graham</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-proquest_reports_31121744823</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2023</creationdate><topic>Architecture</topic><topic>Automation</topic><topic>Carbon</topic><topic>Climate models</topic><topic>Concrete</topic><topic>Construction</topic><topic>Cost control</topic><topic>Design</topic><topic>Energy consumption</topic><topic>Frame structures</topic><topic>Green buildings</topic><topic>Pilot projects</topic><topic>Steel frames</topic><topic>Ventilation</topic><topic>Water use</topic><toplevel>online_resources</toplevel><creatorcontrib>Livesey, Graham</creatorcontrib><collection>ProQuest Central (Corporate)</collection><collection>ABI/INFORM Collection</collection><collection>ProQuest Central (purchase pre-March 2016)</collection><collection>ABI/INFORM Trade &amp; Industry (Alumni Edition)</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>ProQuest Central (Alumni) (purchase pre-March 2016)</collection><collection>ABI/INFORM Collection (Alumni Edition)</collection><collection>Canadian Business &amp; Current Affairs Database</collection><collection>Canadian Business &amp; Current Affairs Database (Alumni Edition)</collection><collection>Materials Science &amp; Engineering Collection</collection><collection>ProQuest Central (Alumni Edition)</collection><collection>ProQuest Central UK/Ireland</collection><collection>Arts Premium Collection</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>Business Premium Collection</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>Business Premium Collection (Alumni)</collection><collection>SciTech Premium Collection</collection><collection>Art, Design &amp; Architecture Collection</collection><collection>ProQuest Business Collection (Alumni Edition)</collection><collection>ProQuest Business Collection</collection><collection>ABI/INFORM Professional Advanced</collection><collection>ProQuest Engineering Collection</collection><collection>ABI/INFORM Trade &amp; Industry</collection><collection>Arts &amp; Humanities Database</collection><collection>Engineering Database</collection><collection>ProQuest One Business</collection><collection>ProQuest One Business (Alumni)</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><collection>Engineering Collection</collection><collection>ProQuest Central Basic</collection><collection>SIRS Editorial</collection><jtitle>The Canadian Architect</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Livesey, Graham</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>CRYSTAL BOXES</atitle><jtitle>The Canadian Architect</jtitle><date>2023-02-01</date><risdate>2023</risdate><volume>68</volume><issue>1</issue><spage>27</spage><epage>30</epage><pages>27-30</pages><issn>0008-2872</issn><eissn>1923-3353</eissn><abstract>Early in the process, the MacKimmie Complex was selected as one of sixteen projects to participate in the Canada Green Building Council (CaGBC)'s Zero Carbon Building pilot program, allowing access to additional technical expertise and to the sharing of experiences with other teams in the pilot program. Replacing an older steel-framed building that was structurally inadequate, the Student Commons contains a variety of classrooms, study spaces, the Registrar's off ice, and the Hunter Hub for Entrepreneurial Thinking. CLIENT UNIVERSITY OF CALGARY | ARCHITECT TEAM DOUGLAS CINNAMON (RAIC), ROBERT CLAIBORNE (RAIC), JOHN SOULELES (RAIC), STEVE VERES, TRACY LIU, MATT PARKS, JODI JAMES, MATTHEW PARKER, NEAL PHILIPSEN, MATT STEWART, LEANNE JUNNILLA, CALEB HILDENBRANDT, KRISTEN FORWARD, HAYDEN PATTULLO, MICHELLE BRECHT, JOEL PENNER, RYAN VAN MARLE, STEPHANIE FARGAS | STRUCTURAL ENTUITIVE | MECHANICAL DIALOG-TIM MCGINN, MIKE BAUER, AMISHA POPE , MIKE TORJAN, MICHAEL MOCHULSKI, ALEX TANSOWNY | ELECTRICAL SMP ENGINEERING | CIVIL | LANDSCAPE DIALOG-DOUG CARLYLE, NATHAN GRIMSON, STACIE HARKER | INTERIORS DIALOG-LOUISE AROCHE, MARIA ZHANG, CARA OAKLEY, LARISSA MOORE | CONTRACTOR STUART OLSON | CLIMATE ENGINEERING TRANSSOLAR KLIMAENGINEERING | ENERGY MODELLING, COMPLIANCE AND TECHNICAL MODELLING DIALOG | CIVIL URBAN SYSTEMS | COMMISSIONING WSP | CODE JENSEN HUGHES | ACOUSTICS PATCHING AND ASSOCIATES | ACCESSIBILITY LEVEL PLAYING FIELD | WIND GRADIENT WIND | ELEVATOR VINSPEC | AREA 35,300 M2 | BUDGET $257 M | COMPLETION TOWER-NOV 2019; BLOCK AND LINK-SEPT 2022 ENERGY USE INTENSITY (PROJECTED) 75 KWH/M2/YEAR | WATER USE INTENSITY (PROJECTED) 0.31 M3/M2/YEAR |</abstract><cop>Toronto</cop><pub>IQ Business Media</pub></addata></record>
fulltext fulltext
identifier ISSN: 0008-2872
ispartof The Canadian Architect, 2023-02, Vol.68 (1), p.27-30
issn 0008-2872
1923-3353
language eng
recordid cdi_proquest_reports_3112174482
source Alma/SFX Local Collection
subjects Architecture
Automation
Carbon
Climate models
Concrete
Construction
Cost control
Design
Energy consumption
Frame structures
Green buildings
Pilot projects
Steel frames
Ventilation
Water use
title CRYSTAL BOXES
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-04T19%3A16%3A29IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=CRYSTAL%20BOXES&rft.jtitle=The%20Canadian%20Architect&rft.au=Livesey,%20Graham&rft.date=2023-02-01&rft.volume=68&rft.issue=1&rft.spage=27&rft.epage=30&rft.pages=27-30&rft.issn=0008-2872&rft.eissn=1923-3353&rft_id=info:doi/&rft_dat=%3Cproquest%3E3112174482%3C/proquest%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=3112174482&rft_id=info:pmid/&rfr_iscdi=true