CRYSTAL BOXES
Early in the process, the MacKimmie Complex was selected as one of sixteen projects to participate in the Canada Green Building Council (CaGBC)'s Zero Carbon Building pilot program, allowing access to additional technical expertise and to the sharing of experiences with other teams in the pilot...
Gespeichert in:
Veröffentlicht in: | The Canadian Architect 2023-02, Vol.68 (1), p.27-30 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Early in the process, the MacKimmie Complex was selected as one of sixteen projects to participate in the Canada Green Building Council (CaGBC)'s Zero Carbon Building pilot program, allowing access to additional technical expertise and to the sharing of experiences with other teams in the pilot program. Replacing an older steel-framed building that was structurally inadequate, the Student Commons contains a variety of classrooms, study spaces, the Registrar's off ice, and the Hunter Hub for Entrepreneurial Thinking. CLIENT UNIVERSITY OF CALGARY | ARCHITECT TEAM DOUGLAS CINNAMON (RAIC), ROBERT CLAIBORNE (RAIC), JOHN SOULELES (RAIC), STEVE VERES, TRACY LIU, MATT PARKS, JODI JAMES, MATTHEW PARKER, NEAL PHILIPSEN, MATT STEWART, LEANNE JUNNILLA, CALEB HILDENBRANDT, KRISTEN FORWARD, HAYDEN PATTULLO, MICHELLE BRECHT, JOEL PENNER, RYAN VAN MARLE, STEPHANIE FARGAS | STRUCTURAL ENTUITIVE | MECHANICAL DIALOG-TIM MCGINN, MIKE BAUER, AMISHA POPE , MIKE TORJAN, MICHAEL MOCHULSKI, ALEX TANSOWNY | ELECTRICAL SMP ENGINEERING | CIVIL | LANDSCAPE DIALOG-DOUG CARLYLE, NATHAN GRIMSON, STACIE HARKER | INTERIORS DIALOG-LOUISE AROCHE, MARIA ZHANG, CARA OAKLEY, LARISSA MOORE | CONTRACTOR STUART OLSON | CLIMATE ENGINEERING TRANSSOLAR KLIMAENGINEERING | ENERGY MODELLING, COMPLIANCE AND TECHNICAL MODELLING DIALOG | CIVIL URBAN SYSTEMS | COMMISSIONING WSP | CODE JENSEN HUGHES | ACOUSTICS PATCHING AND ASSOCIATES | ACCESSIBILITY LEVEL PLAYING FIELD | WIND GRADIENT WIND | ELEVATOR VINSPEC | AREA 35,300 M2 | BUDGET $257 M | COMPLETION TOWER-NOV 2019; BLOCK AND LINK-SEPT 2022 ENERGY USE INTENSITY (PROJECTED) 75 KWH/M2/YEAR | WATER USE INTENSITY (PROJECTED) 0.31 M3/M2/YEAR | |
---|---|
ISSN: | 0008-2872 1923-3353 |