Overcoming Engineering Challenges to Enable Commercial Scale mRNA Vaccine Manufacturing

Increasing production capacity may necessitate the facility to cater for higher hazardous area category (e.g., H-Occupancy) design features, such as specialized building construction and potential blast zones. [...]an assessment should cover: * Quantification of flammable material use for production...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Pharmaceutical Technology 2022-08, Vol.46 (8), p.31-34
Hauptverfasser: Vickers, Julie, Cramer, Peter, Eardley-Patel, Ranna, Excell, Oliver
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Increasing production capacity may necessitate the facility to cater for higher hazardous area category (e.g., H-Occupancy) design features, such as specialized building construction and potential blast zones. [...]an assessment should cover: * Quantification of flammable material use for production steps, including buffer preparation and LNP storage ° Equipment and facility cleaning strategies that contribute to the facility flammable materials inventory * Impact of HVAC design to avoid hazardous atmospheres (e.g., full fresh air), use of local exhaust ventilation (LEV) or fume hoods * Solvent distribution methods (e.g., closed solvent delivery and waste removal systems) * Location of solvent bulk storage outside of the processing area/facility, and piping in what is necessary plus removing spent solvent in a timely manner (e.g., piped transfer to a waste tank for removal by a specialist contractor). At present, the process cannot be fully single-use, so thought needs to be put into the cleaning and sterilization processes, plus the analytical support infrastructure needed for reusable product-contact surfaces. [...]it is recommended that for each mRNA project, consideration is given to the following aspects to determine the link between the equipment available and the facility design: * Need for custom/proprietary equipment * Independent production rooms with "through-wall" buffer transfer through iris ports in from logistics corridor (Buffer Prep/Hold) * Room electrical classification needs versus process step * Equipment selection versus electrical and fire code requirements * Benefits and limitations of implementing single-use technologies, given that the process will be hybrid (with stainless steel). [...]the limited capacity for outsourcing of supporting functions, such as facility environmental monitoring or product sterility testing, should be considered during concept design.
ISSN:1543-2521
2150-7376