Tunnelling from the Vaal River to Chapman's Peak Drive

The half tunnel was excavated as two full height parallel slots running the full length of the tunnel, namely the initial outer slot immediately adjacent to the existing road followed by the inner slot. Drilling for blast holes on a 1 m x 1 m grid was undertaken from the road, that is, perpendicular...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Civil Engineering : Magazine of the South African Institution of Civil Engineering 2004-04, Vol.12 (4), p.17-18
Hauptverfasser: Krone, Bernard, Ramkissoon, Anusha
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The half tunnel was excavated as two full height parallel slots running the full length of the tunnel, namely the initial outer slot immediately adjacent to the existing road followed by the inner slot. Drilling for blast holes on a 1 m x 1 m grid was undertaken from the road, that is, perpendicular to the direction of the tunnel advance. This required the creation of an initial cubby by means of a burn cut.