Once through, times two

On 12 January, Oconee 1 reached full power after being fitted with the world's first replacement once through steam generators. Oconee 2 steam generators are presently being installed while the Oconee 3 steam generators are in their last phases of fabrication, on target for an autumn 2004 chang...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Nuclear Engineering International 2004-04, Vol.49 (597), p.14-19
Hauptverfasser: Klarner, Richard, Boyd, J Thomas, Keck, Michael
Format: Magazinearticle
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:On 12 January, Oconee 1 reached full power after being fitted with the world's first replacement once through steam generators. Oconee 2 steam generators are presently being installed while the Oconee 3 steam generators are in their last phases of fabrication, on target for an autumn 2004 change out.
ISSN:0029-5507
2514-4367