Coiled polyamide-11 high pressure gas pipe costs less to install and operate than steel stick pipe

The April 2003 Nashville Gas installation was the first use of coiled PA-11 pipe. It was part of a much larger project that also used about 5,000 feet of PA-11 pipe in 40-foot sticks. A PLCS-coiled pipe trailer and 2-inch pipe straightener were used to uncoil the coiled PA-11 pipe at Nashville Gas....

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Pipeline & Gas Journal 2006-12, Vol.233 (12), p.33
Hauptverfasser: JARNECKE, Dennis, GARNER, Bobby, SORENSEN, Troy, JONES, Jon, MASON, Jim
Format: Magazinearticle
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The April 2003 Nashville Gas installation was the first use of coiled PA-11 pipe. It was part of a much larger project that also used about 5,000 feet of PA-11 pipe in 40-foot sticks. A PLCS-coiled pipe trailer and 2-inch pipe straightener were used to uncoil the coiled PA-11 pipe at Nashville Gas. One 500-foot coil of 2-inch PA-11 was secured on the unwind stand of the trailer.
ISSN:0032-0188