Best drilling, completion and stimulation methods for CBM reservoirs
Before selecting a completion method for a coalbed methane (CBM) well, nine factors should be considered: investment required; number of coal seams encountered by the borehole; expected production rate; reserves in the various coal intervals; coal-seam permeability and gas content; type of stimulati...
Gespeichert in:
Veröffentlicht in: | World Oil 2008-10, Vol.229 (10) |
---|---|
Hauptverfasser: | , , |
Format: | Magazinearticle |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Before selecting a completion method for a coalbed methane (CBM) well, nine factors should be considered: investment required; number of coal seams encountered by the borehole; expected production rate; reserves in the various coal intervals; coal-seam permeability and gas content; type of stimulation treatment expected, if any; wellbore stability problems; future workover requirements; and artificial lift requirements, if any. To establish a set of best practices for CBM production, relationships among the selection of drilling, completion and stimulation methods and geological characteristics of coalbeds were clarified. |
---|---|
ISSN: | 0043-8790 2831-6304 |