Best drilling, completion and stimulation methods for CBM reservoirs

Before selecting a completion method for a coalbed methane (CBM) well, nine factors should be considered: investment required; number of coal seams encountered by the borehole; expected production rate; reserves in the various coal intervals; coal-seam permeability and gas content; type of stimulati...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:World Oil 2008-10, Vol.229 (10)
Hauptverfasser: RAMASWAMY, Sunil, AYERS, Walter B, HOLDITCH, Stephen A
Format: Magazinearticle
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Before selecting a completion method for a coalbed methane (CBM) well, nine factors should be considered: investment required; number of coal seams encountered by the borehole; expected production rate; reserves in the various coal intervals; coal-seam permeability and gas content; type of stimulation treatment expected, if any; wellbore stability problems; future workover requirements; and artificial lift requirements, if any. To establish a set of best practices for CBM production, relationships among the selection of drilling, completion and stimulation methods and geological characteristics of coalbeds were clarified.
ISSN:0043-8790
2831-6304