Coiled tubing becomes the key enabler for successful multilateral well development campaign offshore Brazil

To develop the mature Pampo Field offshore Brazil, Schlumberger used coiled tubing in perforating, logging for cement evaluation, stimulation and stiffline operations.

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:World Oil 2008-01, p.1
Hauptverfasser: S. Trummer, D. Silva, V. Cano, M. Guzman, N. Siqueira, C. Peixoto, Nazareth, V
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To develop the mature Pampo Field offshore Brazil, Schlumberger used coiled tubing in perforating, logging for cement evaluation, stimulation and stiffline operations.
ISSN:0043-8790