BACK TO SCHOOL
What we do is we remove the old urinal, mark the footprint of the new urinal on the wall, and then cut a hole inside that footprint so when you put that urinal back on the wall, there's no tile repair." Then the plumbing is adjusted: "The drains usually need to be moved because they...
Gespeichert in:
Veröffentlicht in: | Reeves Journal 2.0 2007-12, Vol.87 (12), p.52 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | What we do is we remove the old urinal, mark the footprint of the new urinal on the wall, and then cut a hole inside that footprint so when you put that urinal back on the wall, there's no tile repair." Then the plumbing is adjusted: "The drains usually need to be moved because they're not the same height as the normal urinal. |
---|---|
ISSN: | 0048-7066 2329-0161 |