BACK TO SCHOOL

What we do is we remove the old urinal, mark the footprint of the new urinal on the wall, and then cut a hole inside that footprint so when you put that urinal back on the wall, there's no tile repair." Then the plumbing is adjusted: "The drains usually need to be moved because they&#...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Reeves Journal 2.0 2007-12, Vol.87 (12), p.52
1. Verfasser: Levine, Wendy
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:What we do is we remove the old urinal, mark the footprint of the new urinal on the wall, and then cut a hole inside that footprint so when you put that urinal back on the wall, there's no tile repair." Then the plumbing is adjusted: "The drains usually need to be moved because they're not the same height as the normal urinal.
ISSN:0048-7066
2329-0161