Condition of the thrust front of the Sayano-Shushenskaya HPP after completion of repairs to reduce its perviousness

It is required to regulate filling of the reservoir with consideration of the temperature field of the structure.

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Power technology and engineering 2008-03, Vol.42 (2), p.67-71
Hauptverfasser: Permyakova, L. S., Epifanov, A. P., Stefanenko, N. I.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:It is required to regulate filling of the reservoir with consideration of the temperature field of the structure.
ISSN:1570-145X
1570-1468
DOI:10.1007/s10749-008-0013-z