Efficient Reconstruction of an Open-Hearth Shop in Stages

A plan is described for step-by-step reconstruction of the open-hearth shop at the Ural Railcar Factory. The plan includes the introduction of out-of-furnace treatment of the steel in a ladle-furnace unit, replacement of the open-hearth furnaces by two 30-ton arc steelmaking furnaces, and the introd...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Metallurgist (New York) 2003-01, Vol.47 (1-2), p.79-85
Hauptverfasser: Zinurov, I Yu, Fel'dman, V Z, Shcherbakov, V Yu, Galyan, V S, Nemytov, V S
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A plan is described for step-by-step reconstruction of the open-hearth shop at the Ural Railcar Factory. The plan includes the introduction of out-of-furnace treatment of the steel in a ladle-furnace unit, replacement of the open-hearth furnaces by two 30-ton arc steelmaking furnaces, and the introduction of a chamber-type vacuum-degassing unit.[PUBLICATION ABSTRACT]
ISSN:0026-0894
1573-8892
DOI:10.1023/A:1023838631107