Efficient Reconstruction of an Open-Hearth Shop in Stages
A plan is described for step-by-step reconstruction of the open-hearth shop at the Ural Railcar Factory. The plan includes the introduction of out-of-furnace treatment of the steel in a ladle-furnace unit, replacement of the open-hearth furnaces by two 30-ton arc steelmaking furnaces, and the introd...
Gespeichert in:
Veröffentlicht in: | Metallurgist (New York) 2003-01, Vol.47 (1-2), p.79-85 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A plan is described for step-by-step reconstruction of the open-hearth shop at the Ural Railcar Factory. The plan includes the introduction of out-of-furnace treatment of the steel in a ladle-furnace unit, replacement of the open-hearth furnaces by two 30-ton arc steelmaking furnaces, and the introduction of a chamber-type vacuum-degassing unit.[PUBLICATION ABSTRACT] |
---|---|
ISSN: | 0026-0894 1573-8892 |
DOI: | 10.1023/A:1023838631107 |