Improving Productivity on a Troubled Bridge Project

This paper presents a case study of a bridge constructed under adverse conditions in rural Florida. The major challenges facing the contractor were clearly identified through analysis. The bridge was constructed by an established, experienced bridge contractor that faced many daunting challenges in...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of construction engineering and management 2011-05, Vol.137 (5), p.364-371
Hauptverfasser: Minchin, R. Edward, Lewis, Don W, McLeod, Luke
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper presents a case study of a bridge constructed under adverse conditions in rural Florida. The major challenges facing the contractor were clearly identified through analysis. The bridge was constructed by an established, experienced bridge contractor that faced many daunting challenges in the construction of the bridge foundation, ranging from overdesign to the project manager managing his first construction project. However, the biggest challenge was unforeseen site conditions; namely, some of the most difficult clay imaginable through which to drive piles. These challenges forced the contractor into several tactical maneuvers. In sharing both the methods adapted by the contractor and the results of the adaptations, this paper quantifies for researchers and practitioners how a good contractor made sound, fundamental decisions to overcome severe challenges, improve productivity rates midproject, and eventually make the project a success. A seeming disaster early on, the project was eventually completed in less than the contract duration and at a sizable profit for the contractor.
ISSN:0733-9364
1943-7862
DOI:10.1061/(ASCE)CO.1943-7862.0000291