Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
We consider the problem of minimizing total completion time in a two-stage hybrid flow shop scheduling problem with dedicated machines at stage 2. There exist one machine at stage 1 and two machines at stage 2. Each job must be processed on the single machine at stage 1 and depending upon the job ty...
Gespeichert in:
Veröffentlicht in: | Computers & operations research 2011-07, Vol.38 (7), p.1045-1053 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | We consider the problem of minimizing total completion time in a two-stage hybrid flow shop scheduling problem with dedicated machines at stage 2. There exist one machine at stage 1 and two machines at stage 2. Each job must be processed on the single machine at stage 1 and depending upon the job type, the job is processed on either of the two machines at stage 2.
First, we introduce the problem and establish complexity of several variations of the problem. For the general case, we introduce two heuristics and find a worst case bound on relative error for each of the heuristics. Then, we find optimal solution procedures for some special cases. We also develop a heuristic for a special case where processing times on machine 1 are identical and find a worst case bound on relative error. Finally, we empirically evaluate the heuristics. |
---|---|