Minimizing total completion time in two-stage hybrid flow shop with dedicated machines

We consider the problem of minimizing total completion time in a two-stage hybrid flow shop scheduling problem with dedicated machines at stage 2. There exist one machine at stage 1 and two machines at stage 2. Each job must be processed on the single machine at stage 1 and depending upon the job ty...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & operations research 2011-07, Vol.38 (7), p.1045-1053
1. Verfasser: Yang, Jaehwan
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We consider the problem of minimizing total completion time in a two-stage hybrid flow shop scheduling problem with dedicated machines at stage 2. There exist one machine at stage 1 and two machines at stage 2. Each job must be processed on the single machine at stage 1 and depending upon the job type, the job is processed on either of the two machines at stage 2. First, we introduce the problem and establish complexity of several variations of the problem. For the general case, we introduce two heuristics and find a worst case bound on relative error for each of the heuristics. Then, we find optimal solution procedures for some special cases. We also develop a heuristic for a special case where processing times on machine 1 are identical and find a worst case bound on relative error. Finally, we empirically evaluate the heuristics.
ISSN:0305-0548
1873-765X
0305-0548
DOI:10.1016/j.cor.2010.10.009