A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times
Motivated by applications in iron and steel industry, we consider a two-stage flow shop scheduling problem where the first machine is a batching machine subject to the blocking constraint and the second machine is a discrete machine with shared setup times. We show that the problem is strongly NP-ha...
Gespeichert in:
Veröffentlicht in: | Computers & operations research 2010-05, Vol.37 (5), p.960-969 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Motivated by applications in iron and steel industry, we consider a two-stage flow shop scheduling problem where the first machine is a batching machine subject to the blocking constraint and the second machine is a discrete machine with shared setup times. We show that the problem is strongly NP-hard when the objective is to minimize the makespan. When solved with a heuristic priority rule, the worst case ratio with the minimum makespan is 2. For a more general objective, the minimization of a linear combination of the makespan and the total blocking time, a quadratic mixed integer program is presented first. Then we pinpoint two cases with polynomial time algorithms: the case without blocking constraint and the case with a given job sequence. Also for the general objective, we analyze an approximation algorithm. Finally, we evaluate the algorithms, giving experimental results on randomly generated test problems. |
---|---|
ISSN: | 0305-0548 1873-765X 0305-0548 |
DOI: | 10.1016/j.cor.2009.08.001 |