A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines
This paper considers a two-stage hybrid flow shop scheduling problem with dedicated machines at stage 2. The objective is to minimise the makespan. There is one machine at stage 1 and two machines at stage 2. Each job must be processed on the single machine at stage 1 and, depending upon the job typ...
Gespeichert in:
Veröffentlicht in: | International journal of production research 2010-03, Vol.48 (5), p.1531-1538 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper considers a two-stage hybrid flow shop scheduling problem with dedicated machines at stage 2. The objective is to minimise the makespan. There is one machine at stage 1 and two machines at stage 2. Each job must be processed on the single machine at stage 1 and, depending upon the job type, the job is processed on either of the two machines at stage 2. We first introduce this special type of the two-stage hybrid flow shop scheduling problem and present some preliminary results. We then present a counter example to the known complexity proof of Riane et al. [Riane, F., Artiba, A. and Elmaghraby, S.E., 2002. Sequencing a hybrid two-stage flowshop with dedicated machines. International Journal of Production Research, 40, 4353-4380.] Finally, we re-establish the complexity of the problem. |
---|---|
ISSN: | 0020-7543 1366-588X |
DOI: | 10.1080/00207540802691374 |