A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines

This paper considers a two-stage hybrid flow shop scheduling problem with dedicated machines at stage 2. The objective is to minimise the makespan. There is one machine at stage 1 and two machines at stage 2. Each job must be processed on the single machine at stage 1 and, depending upon the job typ...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production research 2010-03, Vol.48 (5), p.1531-1538
1. Verfasser: Yang, Jaehwan
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper considers a two-stage hybrid flow shop scheduling problem with dedicated machines at stage 2. The objective is to minimise the makespan. There is one machine at stage 1 and two machines at stage 2. Each job must be processed on the single machine at stage 1 and, depending upon the job type, the job is processed on either of the two machines at stage 2. We first introduce this special type of the two-stage hybrid flow shop scheduling problem and present some preliminary results. We then present a counter example to the known complexity proof of Riane et al. [Riane, F., Artiba, A. and Elmaghraby, S.E., 2002. Sequencing a hybrid two-stage flowshop with dedicated machines. International Journal of Production Research, 40, 4353-4380.] Finally, we re-establish the complexity of the problem.
ISSN:0020-7543
1366-588X
DOI:10.1080/00207540802691374