Compressed work-week: psychophysiological and physiological repercussions
This research examines the possible fatigue induced in workers submitted to a compressed 4-40 work-week (i.e. 40 h in 4 days, as compared to the usual 5-40 schedule, i.e. 40 h in 5 days). Two groups of workers from two different factories (4-40 and 5-40 work schedules) manufacturing similar products...
Gespeichert in:
Veröffentlicht in: | Ergonomics 1979-09, Vol.22 (9), p.1001-1010 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This research examines the possible fatigue induced in workers submitted to a compressed 4-40 work-week (i.e. 40 h in 4 days, as compared to the usual 5-40 schedule, i.e. 40 h in 5 days). Two groups of workers from two different factories (4-40 and 5-40 work schedules) manufacturing similar products participated in the study. The analysis of data from measurements of reaction time, heart rate, blood pressure, body temperature, respiratory volumes, O
2
consumption, CO
2
production etc., did not reveal any significant differences between the two groups measured before and after the first and the last day of the work-week. However, the critical flicker fusion frequency and the right hand strength showed a significant greater impairment in the 4-40 workers. We conclude that The fatigue originating from the tasks accomplished by these 4-40 workers is as considerable as the one encountered by the workers of a similar factory working under a 5-40 schedule. |
---|---|
ISSN: | 0014-0139 1366-5847 |
DOI: | 10.1080/00140137908924674 |