Data acquisition and management requirement for ITER
The almost continuous nature of ITER operation necessitates both data acquisition and processing to be in real-time. The distributed control system architecture associated with intelligent front-end data processing and high band-wise communication network technologies must be provided to allow for i...
Gespeichert in:
Veröffentlicht in: | Fusion engineering and design 1999, Vol.43 (3), p.321-325 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The almost continuous nature of ITER operation necessitates both data acquisition and processing to be in real-time. The distributed control system architecture associated with intelligent front-end data processing and high band-wise communication network technologies must be provided to allow for its experimental aspects. These requirement and data processing concepts are described. |
---|---|
ISSN: | 0920-3796 1873-7196 |
DOI: | 10.1016/S0920-3796(98)00400-1 |