Analysis of Space Shuttle ground operations

To assess the feasibility of proposed launch schedules for the Space Shuttle, we have developed a simulation model of the flow of activities comprising Shuttle turn around processing. Considering queueing delays caused by the limited capacity of ground facilities, the model estimates flight starting...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Simulation (San Diego, Calif.) Calif.), 1982-06, Vol.38 (6), p.187-203
Hauptverfasser: Wilson, James R., Vaughan, David K., Naylor, Edward, Voss, Robert G.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To assess the feasibility of proposed launch schedules for the Space Shuttle, we have developed a simulation model of the flow of activities comprising Shuttle turn around processing. Considering queueing delays caused by the limited capacity of ground facilities, the model estimates flight starting dates needed to meet a given launch schedule with a specified level of confi dence. The results of an extensive sensitivity analysis indicate that the currently projected schedules are optimistic and that the turnaround time will substan tially exceed the current goal of 28 days.
ISSN:0037-5497
1741-3133
DOI:10.1177/003754978203800602