Fabrication of an ITER middle-scaled shielding blanket module mock-up
To demonstrate the fabricability of the first wall (FW) blanket, a middle-scaled mock-up was fabricated using a sandwiched tube technique. The technique used a 20-mm thick DSCu heat sink containing stainless steel cooling tubes oriented poloidally. After hot isostatic pressing (HIP) bonding, microsc...
Gespeichert in:
Veröffentlicht in: | Fusion engineering and design 1998-09, Vol.39-40 (Pt A), p.765-773 |
---|---|
Hauptverfasser: | , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To demonstrate the fabricability of the first wall (FW) blanket, a middle-scaled mock-up was fabricated using a sandwiched tube technique. The technique used a 20-mm thick DSCu heat sink containing stainless steel cooling tubes oriented poloidally. After hot isostatic pressing (HIP) bonding, microscopic observations of the bonded interfaces were undertaken using the remnant edge of the mock-up. Pressure-resistant and helium leak tests were also performed to confirm the integrity of pressure boundaries. |
---|---|
ISSN: | 0920-3796 |