Status of the commissioning of LISA for the SURF FEL experiment
The status of the commissioning of the 25 MeV superconducting (SC) linac LISA is reported. Some crucial steps toward routine operation of the 1 MeV injector and the cryogenic system have been done. The problems related to the diagnostic setup for spontaneous emission measurement and cavity alignment...
Gespeichert in:
Veröffentlicht in: | Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment Accelerators, spectrometers, detectors and associated equipment, 1993-07, Vol.331 (1), p.272-275 |
---|---|
Hauptverfasser: | , , , , , , , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The status of the commissioning of the 25 MeV superconducting (SC) linac LISA is reported. Some crucial steps toward routine operation of the 1 MeV injector and the cryogenic system have been done. The problems related to the diagnostic setup for spontaneous emission measurement and cavity alignment are also presented. |
---|---|
ISSN: | 0168-9002 1872-9576 |
DOI: | 10.1016/0168-9002(93)90057-O |