Optimal production planning in a stochastic manufacturing system with long-run average cost

This paper is concerned with the optimal production planning in a dynamic stochastic manufacturing system consisting of a single machine that is failure prone and facing a constant demand. The objective is to choose the rate of production over time in order to minimize the long-run average cost of p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of optimization theory and applications 1997, Vol.92 (1), p.161-188
Hauptverfasser: SETHI, S. P, SUO, W, TAKSAR, M. I, ZHANG, Q
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper is concerned with the optimal production planning in a dynamic stochastic manufacturing system consisting of a single machine that is failure prone and facing a constant demand. The objective is to choose the rate of production over time in order to minimize the long-run average cost of production and surplus. The analysis proceeds with a study of the corresponding problem with a discounted cost. It is shown using the vanishing discount approach that the Hamilton-Jacobi-Bellman equation for the average cost problem has a solution giving rise to the minimal average cost and the so-called potential function. The result helps in establishing a verification theorem. Finally, the optimal control policy is specified in terms of the potential function.
ISSN:0022-3239
1573-2878
DOI:10.1023/A:1022696215389