Constructed wetlands for mitigation of atrazine-associated agricultural runoff
Atrazine was amended into constructed wetlands (59-73x14x0.3 m) for the purpose of monitoring transport and fate of the pesticide to obtain information necessary to provide future design parameters for constructed wetlands mitigation of agricultural runoff. Following pesticide amendment, a simulated...
Gespeichert in:
Veröffentlicht in: | Environmental pollution (1987) 2000-12, Vol.110 (3), p.393-399 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Atrazine was amended into constructed wetlands (59-73x14x0.3 m) for the purpose of monitoring transport and fate of the pesticide to obtain information necessary to provide future design parameters for constructed wetlands mitigation of agricultural runoff. Following pesticide amendment, a simulated storm and runoff event equal to three volume additions was imposed on each wetland. Targeted atrazine concentrations were 0 microg/l (unamended control), 73 microg/l, and 147 microg/l. Water, sediment, and plant samples were collected weekly for 35 days from transects longitudinally distributed throughout each wetland and were analyzed for atrazine using gas chromatography. Between 17 and 42% of measured atrazine mass was within the first 30-36 m of wetlands. Atrazine was below detection limits (0.05 microg/kg) in all sediment and plant samples collected throughout the duration of this study. Aqueous half lives ranged from 16 to 48 days. According to these data, conservative buffer travel distances of 100-280 m would be necessary for effective runoff mitigation. |
---|---|
ISSN: | 0269-7491 1873-6424 |