The Restructuring and Privatisation of Britain's CEGB-Was It Worth It?

We report a social cost-benefit analysis of the privatisation and restructuring of the Central Electricity Generating Board which generated and transmitted all public electricity in England and Wales until 1990. The main benefits came from generator efficiency gains, switching from nuclear power, an...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:The Journal of industrial economics 1997-09, Vol.45 (3), p.269-303
Hauptverfasser: Newbery, David M., Pollitt, Michael G.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We report a social cost-benefit analysis of the privatisation and restructuring of the Central Electricity Generating Board which generated and transmitted all public electricity in England and Wales until 1990. The main benefits came from generator efficiency gains, switching from nuclear power, and lower emissions. The main costs came from higher prices for imported French electricity, the cost of restructuring and premature investment in new gas-fired generating plant. Our central estimate is a permanent cost reduction of 5% per year, equivalent to an extra 40% return on assets. Consumers and government lose, and producers gain more than the cost reduction.
ISSN:0022-1821
1467-6451
DOI:10.1111/1467-6451.00049